High Precision Roughing Lasting Line
Categories: Upper & Sole Processing Equipment
Exhibitor Information

MARST SAFETY EQUIPMENT (TIANJIN) CO., LTD.
This set of equipment is specially designed for the pouring line, forming a complete set of two-in-one working method is also a faster and more labor-saving way of working.
In cooperation with Marst's automatic line, only nine people can complete the entire production process. That is, drop last, set last, put steel head, front upper machine,finishing of the rear upper, shoe last into the mold and lock, take out the shoe, trim, management. A total of nine people complete all the work from the lasting to the finished shoe. Saving nearly double the labor cost! (Saving a set of equipment in three years) It is the future development direction of shoe making.
Technical Parameter
Machine Model:MT-21T
Station:Can be customized
Installation size:15m*3.5m
Voltage:3-380V AC 50Hz
Power:10.5KW
Oven power:48KW/unit
Yield:10-18 seconds/pair
In cooperation with Marst's automatic line, only nine people can complete the entire production process. That is, drop last, set last, put steel head, front upper machine,finishing of the rear upper, shoe last into the mold and lock, take out the shoe, trim, management. A total of nine people complete all the work from the lasting to the finished shoe. Saving nearly double the labor cost! (Saving a set of equipment in three years) It is the future development direction of shoe making.
Technical Parameter
Machine Model:MT-21T
Station:Can be customized
Installation size:15m*3.5m
Voltage:3-380V AC 50Hz
Power:10.5KW
Oven power:48KW/unit
Yield:10-18 seconds/pair
Other Products (2)